We engineer to:
- NEC Classification (Class, Division)
- Electrical Requirements per NEC classification
- Make Up Air and Purging Requirements
- Access Requirements
- Preferred Construction Materials (Noncombustible, Fire resistance ratings)
- Size
- Preferred Building / Room Layout / Location
- Utilities
- Ventilation / Filtration
- Temperature and Humidity Control
- Alarm Systems
- Secondary Containment
- Sound Control
- Ballistics
- Explosion Proof
Unit of Measure